Skip to content
Monday – Friday: 7 a.m. – 4 p.m.(717) 555-0100

For designers and builders

What we ask for, and what comes back

A fixture schedule and a photo of the rough-in is all the install needs.

  • The spec sheet, before the order

    Maker, model, finish and the installation sheet. We check it against the sink, counter and valves.

  • Rough-in notes back

    Valve depth, drain position and hole count, in writing, while tile can still change.

  • Finish samples in the room

    We compare tones in the room's own light before anything is tightened.

  • One person to answer

    Dolores books the work and answers messages, so you aren't chasing three techs.

On the schedule

We come after counters and tile

Fixtures go in when the surfaces around them are finished, so nothing we do gets scratched by the next trade, and nothing the next trade does gets scratched by us.

Where we fit

  • Install after counters, tile and grout are set

  • Before final paint touch-up and the last clean

  • Condo and association rules built into the date

A finished kitchen with wood cabinets, a quartz island and a sage green wall

Questions from designers

Can you work in a condo or townhouse association?

Yes, it's most of what we do. Send your association's contractor rules (work hours, elevator, insurance certificate) and we'll plan around them.

Does a fixture swap need a permit?

Rules differ by township. Swapping one faucet for another rarely does. Moving a supply or drain line, or adding a fixture, often does. We'll tell you which side your job falls on.

How long does an install take?

A faucet swap is usually part of a morning. A shower valve or a tub filler takes longer and sometimes means opening a wall. We give you a window once we've seen photos of the space.

Are you licensed and insured?

The registration and insurance we carry are listed in the footer and on the About page. We send a certificate of insurance to your association or designer on request.